Back to "before Pics"
The Body Restoration
Hold pointer over the pics for a moment for text
The Dynacorn Qrt. went on very nicely and the gap at the door looks perfect!
The guy that hung the qrt. when ahead and sprayed a coat of epoxy primer on it, although its not really needed with the EDP coating that comes on the new qrt.
OK, now that the new qrt. is hung, its time to remove the body from the frame.  I used a single engine hoist and a load leveler attached to chains that bolted to the seat belt mounting holes to lift the body.
Here you can see the basic lifting set-up.  Worked pretty slick
The body is up and supported on concrete blocks
Front view of body supported on blocks
Chassis has been rolled out and is now on the other side of the shop for retoration.  See the
OK, progress is being made! Check back soon for updates
Back to "before Pics"